Probabilistic maximization of time-dependent capacities in a gas network
| dc.bibliographicCitation.seriesTitle | WIAS Preprints | eng |
| dc.bibliographicCitation.volume | 3066 | |
| dc.contributor.author | Heitsch, Holger | |
| dc.contributor.author | Henrion, René | |
| dc.contributor.author | Tischendorf, Caren | |
| dc.date.accessioned | 2026-03-26T09:05:49Z | |
| dc.date.available | 2026-03-26T09:05:49Z | |
| dc.date.issued | 2023 | |
| dc.description.abstract | The determination of free technical capacities belongs to the core tasks of a gas network owner. Since gas loads are uncertain by nature, it makes sense to understand this as a probabilistic problem as far as stochastic modeling of available historical data is possible. Future clients, however, don't have a history or they do not behave in a random way, as is the case, for instance, in gas reservoir management. Therefore, capacity maximization turns into an optimization problem with uncertainty-related constrained which are partially of probabilistic and partially of robust (worst case) type. While previous attempts to solve this problem had be devoted to models with static (time-independent) gas flow, we aim at considering here transient gas flow subordinate to a PDE (Euler equations). The basic challenge here is two-fold: first, a proper way of joining probabilistic constraints to the differential equations has to be found. This will be realized on the basis of the so-called spherical-radial decomposition of Gaussian random vectors. Second, a suitable characterization of the worst-case load behaviour of future customers has to be figured out. It will be shown, that this is possible for quasi-static flow and can be transferred to the transient case. The complexity of the problem forces us to constrain ourselves in this first analysis to simple pipes or to a V-like structure of the network. Numerical solutions are presented and show that the differences between quasi-static and transient solutions are small, at least in these elementary examples. | eng |
| dc.description.version | publishedVersion | eng |
| dc.identifier.uri | https://oa.tib.eu/renate/handle/123456789/33694 | |
| dc.identifier.uri | https://doi.org/10.34657/32762 | |
| dc.language.iso | eng | |
| dc.publisher | Berlin : Weierstraß-Institut für Angewandte Analysis und Stochastik | |
| dc.relation.doi | https://doi.org/10.20347/WIAS.PREPRINT.3066 | |
| dc.relation.essn | 2198-5855 | |
| dc.relation.issn | 0946-8633 | |
| dc.rights.license | This document may be downloaded, read, stored and printed for your own use within the limits of § 53 UrhG but it may not be distributed via the internet or passed on to external parties. | eng |
| dc.rights.license | Dieses Dokument darf im Rahmen von § 53 UrhG zum eigenen Gebrauch kostenfrei heruntergeladen, gelesen, gespeichert und ausgedruckt, aber nicht im Internet bereitgestellt oder an Außenstehende weitergegeben werden. | ger |
| dc.subject.ddc | 510 | |
| dc.subject.other | Capacity maximization | eng |
| dc.subject.other | gas networks | eng |
| dc.subject.other | probabilistic constraints | eng |
| dc.subject.other | chance constraints | eng |
| dc.subject.other | transient flow | eng |
| dc.title | Probabilistic maximization of time-dependent capacities in a gas network | eng |
| dc.type | Report | |
| tib.accessRights | openAccess | |
| wgl.contributor | WIAS | |
| wgl.subject | Mathematik | |
| wgl.type | Report / Forschungsbericht / Arbeitspapier |
Files
Original bundle
1 - 1 of 1
Loading...
- Name:
- wias_preprints_3066.pdf
- Size:
- 421.96 KB
- Format:
- Adobe Portable Document Format
- Description:
